Case

For almost 50 years, we at Fumex have provided our customers with effective products against airborne pollutants for a better working environment. Read below some examples of what our customers think of us and our products.
11-11-2025

Bronkhorst USA chooses Movex ME for its new laboratory environment

When Bronkhorst USA set up a new laboratory environment in Bethlehem, Pennsylvania, they required a flexible, reliable solution. Together with installer Mohawk Contracting and Development, they selected the Movex ME, a high-performance extraction arm designed specifically for laboratory applications.

Throughout the project, the scope was adjusted to meet the customer’s needs, including the addition of a fan and accessories. Movex provided support during the entire process, including on-site assistance during installation. The result was a smooth installation and a solution that exceeded expectations.

– We had an excellent experience working with Movex. They offered valuable support in helping our client select the right equipment, and everything was delivered as scheduled. Installation was straightforward, with on-site support provided to ensure everything was set up correctly, says Ryan, Mohawk Contracting and Development.

Movex delivered the following equipment:

  • 5 pcs MET 1500-75, 60″ x 3″ extraction arms (Snorkels)
  • 5 pcs MTI 2000, 80″ ceiling brackets
  • 5 pcs MEK 350-75, Ø 14″ dome hoods
  • 5 pcs MCT escutcheon plates
  • 1 pc FBE fan with accessories

 

Snorkels 1 e1762871982163

Case 11.11.2025

Bronkhorst USA chooses Movex ME for its new laboratory environment

When Bronkhorst USA set up a new laboratory environment in Bethlehem, Pennsylvania, they required a flexible, reliable solution. Together with installer Mohawk Contracting and Development, they selected the Movex ME, a high-performance extraction arm designed specifically for laboratory applications.

Throughout the project, the scope was adjusted to meet the customer’s needs, including the addition of a fan and accessories. Movex provided support during the entire process, including on-site assistance during installation. The result was a smooth installation and a solution that exceeded expectations.

– We had an excellent experience working with Movex. They offered valuable support in helping our client select the right equipment, and everything was delivered as scheduled. Installation was straightforward, with on-site support provided to ensure everything was set up correctly, says Ryan, Mohawk Contracting and Development.

Movex delivered the following equipment:

  • 5 pcs MET 1500-75, 60″ x 3″ extraction arms (Snorkels)
  • 5 pcs MTI 2000, 80″ ceiling brackets
  • 5 pcs MEK 350-75, Ø 14″ dome hoods
  • 5 pcs MCT escutcheon plates
  • 1 pc FBE fan with accessories

 

Snorkels 1 e1762871982163